Homepage review · Business facts marked below still need confirmation · Inquiry delivery via Web3Forms

BATCHING PLANTS / TYPE DETAIL

Foundation-free concrete batching plant.

A type listed in the EPDAS catalogue. The available project source describes a customized configuration for a height-restricted site and a possible future relocation.

Foundation-free plant illustration with aggregate bins, conveyor, mixer and horizontal silo
Supplied type illustration. It is not a confirmed MHZS120 project image.

A category, not a model specification.

The catalogue names Foundation-Free Concrete Batching Plant as a separate type alongside Stationary, Mobile, Portable, Containerized and Dry Mix. The original classification catalogue is now supplemented by a separate model specification table.

In the Philippines narrative, the selected arrangement is described as a foundation-free MHZS120 with an aggregate waiting hopper. That project example is presented separately so a project-specific configuration is not mistaken for a standard supply scope.

The additional technical source lists MHZS90, MHZS120 and MHZS180, with JS1500, JS2000 and MAO3000 central mixers respectively. Model specifications can now be compared below; the supplied project story remains a separate evidence source.

Working sequence.

For the documented Philippines configuration, the source describes automatic weighing, feeding, mixing and discharge, managed through a computer-based control system.

Pending confirmationA type-wide process diagram, interlocks, mixer specification and operating manual are not available. This page is not an operating instruction.

Features described in the available project.

These points are limited to the supplied case narrative. Availability on another configuration must be confirmed.

Model differences in the new technical table

Pending confirmationA common plant-type name does not make every configuration identical. The final supply list, options and test conditions need confirmation.

Ground conditions and selection boundaries.

The case source describes hardened ground without embedded reinforcement for its proposed foundation-free arrangement. It does not supply soil-bearing data, structural calculations or a civil drawing.

Pending confirmationDo not interpret “foundation-free” as permission to omit site engineering. Ground preparation, anchoring, wind/seismic design, drainage, utilities and local approvals must be established for the actual site.

Source-listed model specifications.

The supplied technical table lists three foundation-free models. Values below are presented for the named model; the source does not provide a test/rating basis or confirm another project’s configuration.

Foundation-free plants — MHZS90 / MHZS120 / MHZS180View source-listed specifications

Client-supplied technical data. Values apply only to the named model/configuration. Test conditions, local requirements and final supply scope remain to be confirmed. A dash preserves an empty source cell; it does not mean zero or included equipment.

Pending confirmationThe table lists MHZS120 productivity as 120 m³/h; the Philippines narrative states a 90 m³/h requirement and reports 90 m³/h output. Their measurement/configuration basis is not supplied. Neither is presented as independently verified site performance.

Scroll horizontally to compare model columns →

Foundation-free plants — MHZS90 / MHZS120 / MHZS180
ModelMHZS90MHZS120MHZS180
Central mixing consoleJS1500JS2000MAO3000
productivity90 cubic meters /hour120 cubic meters /hour180 cubic meters /hour
Main structureMixing platform steel frame + free base steel frame
Aggregate Storage4 boxes * 8m34 boxes* 12m34 boxes* 20m3
Aggregate feed typeBelt conveyor (B=800mm, 22kw)Belt conveyor (B=1000mm, 37kw)Belt conveyor (B=1000mm, 45kw)
Aggregate waiting boxNoYesYes
Aggregate weighing system4 sets (independent)4 sets (independent)4 sets (independent)
Cement weighing system2 sets
(+ physical dust collector)
2 sets
(+ Electrostatic precipitator)
2 sets
(+Pulse dust collector)
Water weighing system1 Set
(+1.5m3 plastic  water tank)
1 Set
(+10m3 steel plate  water tank)
1 Set
(+10m3 steel plate  water tank)
Liquid Additive Weighing System1 Set
(+2m3 plastic   liquid tank)
1 Set
(+4m3 plastic   liquid tank)
2 sets
(+8m3 plastic   liquid tank)
Stirring power2*30kW2*37 kW2*55kW
Total Power113 kW136 kW200 kW
Dimensions30m*4m*10m36m*4.2m*12m46.5m*4.3m*13m
gross weight28 tons35 tons42 tons
Overall shapeThe entire factory is lined up in a row, with free basic design.

Structure, layout and installation.

The case describes an aggregate waiting hopper, four-bin separate aggregate weighing, separate liquid/cement weighing and a horizontal cement silo. L-shaped and I-shaped layouts were considered; the source reports the I-shaped layout was selected for available site space.

Pending confirmationNo dimensioned drawing or approved installation method is supplied. The described arrangement is a project example, not a standard bill of materials or installation commitment.

Source-listed overall size and weight

The source describes a mixing-platform steel frame plus a free-base steel frame. These overall dimensions are not a foundation, lifting or site-installation drawing.

Application in the supplied case.

The Philippines customer wanted a larger commercial concrete plant for its own new projects and local concrete sales. Airport-related height limits, possible relocation and multiple concrete grades shaped the discussion.

Pending confirmationSuitability for another location, material or duty requires engineering review. No general capability range is asserted.

Project evidence.

Read the complete narrative, including what was requested, how the configuration was explained and which results remain unverified.

Read the Philippines project

Pending confirmationCommissioning records, output measurements and project-photo attribution are still missing.

Procurement and support scope.

Pending confirmationInstallation, commissioning, operator training, spare parts, warranty terms and response times are not confirmed for this type. They must be set in a project-specific proposal.

Review the E/P/C responsibility matrix

Questions to settle before a proposal.

Does the category name remove all civil work?

No engineering conclusion can be drawn from the name. The source describes one hardened-ground arrangement; bearing capacity and site design remain unconfirmed.

Can the Philippines case output be used for my project?

No. The value is source-reported for one case without a test record. A project-specific specification and acceptance method are needed.

Is installation or commissioning included?

The scope is pending confirmation. See the responsibility matrix and discuss the required supply boundary.

Start with your project.

Include your concrete demand, available site dimensions, height restriction, ground information and plans to relocate.